PORTFOLIO
Key Projects in Local and Regional Infrastructure Development
The Style Construct portfolio includes a wide range of works – from water and sewer networks to bridges and roads – all executed with a strong focus on quality, efficiency, and meeting deadlines.
Projects that deliver concrete results and visible improvements in the communities where we operate.
Civil Engineering Structures: Bridges, Viaducts, and Road Overpasses
Construction of a Bridge over the Neajlov River
Vadu Lat Village,
Bucsani Commune, GR County
Completed Works:
-
Bridge Construction:
New reinforced concrete bridge, length = 91.25 m, with 4 spans of 21 m each.
-
Infrastructure Works:
2 abutments + 3 piers, founded indirectly on 8 columns. Superstructure with 2 pedestrian sidewalks (width 1 m). Parapets H4b (bridge) and H3 (ramps). Expansion joints + embankment connections.
-
Signaling and Marking Systems:
Installation of road signs and longitudinal and transverse road markings.
-
Bank Protection Works:
Concrete-faced gabions for bank protection + downstream foundation sill. Riprap made of rockfill for stability and erosion protection.
Construction of a Bridge over the Dâmbovița River
Ungureni Village,
Dragomirești Commune, DB County
Completed Works:
-
Bridge Construction:
New reinforced concrete bridge on precast beams, length = 72 m, with 4 spans of 18 m each.
-
Infrastructure Works:
Indirect foundations on bored piles (16 m), reinforced raft foundations, abutment elevations and wings, pier elevations, box girder and quarter cone stairs.
-
Suprastructura Bridge Superstructure:
Superstructure installation, permanent road signage, and ramp and access arrangements
-
Foundation Sill in the Minor Riverbed:
Constructed in the minor riverbed downstream of the bridge to protect the foundations.
Construction of Bridge on DN1
Ploiești-Brașov
km 135+332, over Azuga stream,
Azuga locality
Completed Works:
-
Bridge Construction:
New reinforced concrete bridge, length = 32.30 m, width = 12.30 m, roadway 8.30 m (2 lanes).
-
Infrastructure Works:
2 abutments (length = 11.60 m), founded on bored piles (10.00 m). Deck with 4 prestressed beams and monolithic slab.
-
Bridge Superstructure:
Reinforced concrete slab with 2 sidewalks. Pedestrian and directional parapets type H4b. Included drainage outlets.
-
Strengthening and Ramps:
Ramps strengthened over 35 m. Platforms: 10.00 m (Ploiești), 15.90 m (Brașov). Roadway 8.00 m, sidewalks 2.00–2.50 m. Parapet H1 (86 m).
-
Riverbed Arrangement and Bank Protection:
Arranged riverbed: 47 m, with gabion mattress + concrete (10 cm). Foundation sill, bank reinforcements + riprap.
-
Installation Relocation and Protection:
Relocation/protection of installations and longitudinal road markings.
Construction of Road Overpass and Traffic Ramp Arrangements
Traffic Flow Improvement
A1 (km 23+068)
Completed Works:
-
Overpass over A1
Construction of a new overpass parallel to the existing one, to improve traffic flow in the area.
-
Ramps and Retaining Wall
Arrangement of connecting ramps to the overpass and construction of a retaining wall for soil stabilization.
-
Roundabouts at Joița and Bolintin Deal
Construction of roundabouts at intersections with DC 149 (Joița) and DC 148 (Bolintin Deal).
-
Connecting Roads and Sidewalks
Construction of connecting roads with a new road system and sidewalks.
-
Acceleration/Deceleration Lanes on A1
Arrangement of dedicated lanes in the area of the road junction.
-
Public Lighting
Installation of metal lighting poles.
-
Water Collection and Drainage
Construction of carriageway and shoulder gutters for water collection.
-
Road Signage
Installation of signs, L- and T-type cantilever supports, longitudinal and transverse road markings.
Road Structure Repair and Reinforcement Works
Safety Measures and Strengthening
DN 71, km 98+800
Completed Works:
-
Reinforcement Works:
Reinforcement over 50 m: void filling, self-drilling micropiles (vertical and inclined), H4b parapet on concrete beam.
-
Road Repair Works:
Repair over 100 m: removal of road layer, micropiles in road body, repaired gutters and ditches, including drainage.
-
Concrete Works:
C25/30 raft foundation and C30/37 connecting slab – new durable and stable road foundation.
-
New Road Structure Repair:
Road structure repaired over 100 m (width 8.35 m), with longitudinal road markings.
ROAD MODERNIZATION
AND OPTIMIZATION
Intersection
Arrangement
DN 65B
KM 3+500
with Petrochemical Workers Boulevard
Roundabout Solution
Completed Works:
-
Central Island and Signaling Ring arranged
for efficient traffic organization and direction.
-
Road and Sidewalk Rehabilitation
through surface layer renewal and existing infrastructure reinforcement.
-
Drainage System
installation of drainage inlets and inspection chambers to ensure proper stormwater evacuation.
-
Public Lighting at Intersection
installation of LED lighting poles with photovoltaic panels for energy efficiency.
-
Traffic Safety Measures
installation of metal fences, New Jersey concrete barriers, vertical road signage with L-type cantilever supports, and application of permanent road markings.
County Road
Modernization
DJ412C
Ogrezeni (DJ 412A) - Podișoru
Bucșani – Obedeni - Uiești
Goleasca - DJ 601 - 3,907 km
Completed Works:
-
Existing Road System Rehabilitation
through foundation strengthening and application of a new wearing course.
-
Sidewalk and Bicycle Lane Arrangement
in localities, ensuring the safety of pedestrians and cyclists.
-
Stormwater Drainage Works:
- Carriageway gutters for efficient water collection.
- Concrete-lined ditches and earth ditches for controlled water evacuation.
- Cross culverts to ensure continuity of water flow. -
Modernization of Side Roads
for easy access and optimal connectivity to the main network.
Road and Pedestrian
Infrastructure Modernization
Bolintin Vale – Phase I – Rehabilitation and modernization of streets, arrangement of sidewalks and bicycle lanes
Completed Works:
-
Earthworks, Infrastructure, and Superstructure for Sidewalks
including underground conduit for cables, bicycle lanes, and stormwater drainage system.
-
Earthworks, Infrastructure Works, and Road Superstructure (Carriageway)
with stormwater drainage system: precast concrete gutters and concrete-lined ditches
-
Vertical Road Signage and Permanent Markings
A1 Highway Access Optimization, km 13
CTPark Bucharest
Reconfiguration of the road infrastructure for faster access to the CTPARK industrial park.
Completed Works:
-
Road Overpass:
53.24 m overpass above utility networks, providing access to the industrial park at km 13 on A1, crossing major aqueducts (APA NOVA, Crivina-Roșu, Ogrezeni-Dragomirești) and the double-box canal.
-
Overpass Construction Works:
Drilling columns ø1080 mm, length 15 m, installation of abutments and piers, superstructure construction, installation of precast beams, road system construction, expansion joints, and installation of H3-type metal parapet for road safety.
-
Road Rehabilitation and Extension:
Existing road system rehabilitation, widening, and construction of a new access ramp.
-
Roundabout Infrastructure:
Construction of safety ring, signage, and separator islands.
-
Retaining Wall:
Construction of a retaining wall to support the road infrastructure.
-
Stormwater Drainage Works:
New network of pipes, manholes, drainage inlets, and pumping stations.
-
External Electrical Installation Works:
Installation of grounding system, electrical cables, lighting poles, and electrical panels.
-
Permanent Road Signage:
Installation of road signs, L-type cantilever supports, and longitudinal and transverse road markings.
UTILITY NETWORKS
Extension and Modernization
Works of Infrastructure in Bolintin Deal Commune
Extension of water and sewer networks, road modernization, and construction of a stormwater collector canal.
Completed Works:
-
Extension of Water and Sewer Networks and Related Connections in Bolintin Deal Commune:
• Installation of pipes for water and sewer networks; • Removal and restoration of road systems affected by works;
• Construction of connections for gravity sewer and vacuum sewer systems;
• Potable water supply connections for each household. -
Stormwater Collector Canal on Veterinarilor Street, Bolintin Deal Commune:
• Earthworks, carriageway arrangement, sidewalks, and parking; • Appropriate road signage, including gutters and bollards for pedestrian protection;
• Installation of reinforced concrete pipes for the stormwater network, Ø1200 mm;
• Construction of inspection chambers for the stormwater network, including C1, C2 chambers and curved-profile monolithic reinforced concrete chamber.
